WORK
EXPERIENCE
|

Switchboard Revamping, Genneia

At Río Mayo Power Station we connected measuremet instruments for LV and MV...

Circuit Breaker Maintenance, Energyst

We carried a complete maintenance for ABB SACE, Schneider...

Circuit Breaker Maintenance, Genneia

We carried a complete maintenance of eight ABB SACE Circuit Breakers...

Mina Manantial espejo, Virtual Gasnet International

Working as ABB sub-contractors we attended an emergency call to repair an ABB SACE Circuit Breaker installed on a Generator Set...

Petrobrás Refinery, Ingen SA

Hired by Ingen SA we installed a DC/DC converter used to increase the operating time...

Generator AVR service, Ingen SA

Emergency repair of a 1980 AVR (Automatic Voltage Regulator) Nishishiba fitted on a turbogenerator at Petrobras Building...

Confitería Vicente López

Due to trouble with the ground system and residual current equipment we changed...

Dredges: La Boussole – Le Guerrier, ABB S.A.

In Le Boussole and Le Guerrier ships, facing Mar del Plata shores, we attended an emergency service for ABB Emax Circuit Breakers...

Cámara Argentina de la Construcción, Servicio Técnico S.A.

We changed an old auto transformer start for a new electronic soft starter in an 80HP central cooling system compressor...

Estudios Cuyo, Servicio Técnico S.A.

We carried a complete maintenance that included Circuit Breaker complete ...

Estudios Telefé, Servicio Técnico S.A.

We built a new switchboard with a new logic command for 4 Roof Top cooling systems which worked...

Universidad de Belgrano, Servicio Técnico S.A.

We changed an old auto transformer start for a new electronic soft starter in an evaporative cooling system....

Aeropuertos Argentina 2000

Installation and configuration of a Tecsystem temperature control for a 500kVA dry transformer....

Circuit Breaker Retrofit DREDGE Capitán Núñez

We replaced three Siemens circuit breakers with ABB SACE Tmax T6 at Tandanor shipyard...

Circuit Breaker Maintenance Peugeot-Citroën

We provided maintenance for LV, MV and HV Circuit Breakers. Contact resistance, opening and...

Retrofit kits for Circuit Breakers Acindar

Working as ABB sub-contractors we built six retrofit kits to fit ABB SACE Emax E3 to...

Circuit Breaker Retrofit installation Necochea Power Plant

We supervised the mechanical mounting of a retrofit kit for an ABB SACE Tmax T4 to replace a SACE Z320. New schematics for the logic...

Fixed part of Circuit Breaker reparation Explora S.A.

We repaired the fixed part of a withdrawable Circuit Breaker at...

Circuit Breaker Maintenance Dock Sud Power Plant

We provided maintenance for LV and MV Circuit Breakers. Contact resistance, opening and closing times measurement...

Generator Set Installation 100kVA Samsung

We installed a 100kVA Generator Set at Samsung warehouses...

Design and building of an Automatic Transfer Switchboard Samsung

We designed and built an Automatic Transfer Switchboard base on ABB SACE circuit breakers and an ATS 021. The Automatic...

Cable tray and switchboards installation Samsung

Over 200m of cable trays and installation of main and secondary switchboards...

Wind Generator installation 1kW ALP S.A.

Mechanical and electrical installation of wind generators in:...

400W Photovoltaic Installation Santiago del Estero ALP S.A.

We performed a 400W photovoltaic installation including solar cells, batteries, regulators, inverters and switchboards in...

Photovoltaic Installation Allianz Argentina ALP S.A.

Working as ALP SA sub-contractors we installed a switchboard with solar regulators, data logger and mini circuit...

Automatic Transfer Switchboard ALP S.A.

Design and built of an Automatic Transfer Switchboard to supply energy from batteries or from a 50kVA Generator...

Switchboards for industrial cooling Servicio Técnico S.A.

We built several Switchboards for industrial cooling and heating.

Service and maintenance for Main Switchboard Aeropuertos Argentina 2000 S.A.

The main switchboard has an ABB PLC that controls the electrical transference between the grid supply and a 500kVA Generator Set. As the switchboard...

Disconnector Aeropuertos Argentina 2000 S.A.

We replaced two disconnectors of an electrical water pump system for fire extinguishing...

Design and installation of an UPS Dr. Alberto Tolcachier

Based on power and endurance requirements we designed a UPS for supplying medical sample refrigerator. In case...